The Atlantic crossing had been in the planning for some time. Coastal cruising equipment was no longer enough for nearly 3,000 nautical miles of open ocean, so before leaving the Mediterranean I worked through a substantial preparation list for Malua.
Preparing Malua
Some equipment that had not been needed for Mediterranean coastal cruising came back aboard. The windvane self-steering and wind generator were reinstated, and I added a Vesper AIS system with a loud alarm and a satellite phone connected to the computer. The watermaker membrane was reinstalled and tested, the liferaft serviced, the 406 EPIRB checked, and the engine, generator, electric winches, windlass and rudder bearing all received attention.
I also fitted a second VHF antenna at the masthead, replaced navigation lights with LEDs, improved the bilge arrangements and made sure cupboards and floor hatches could be secured for an ocean passage. The objective was simple: Malua should leave in top condition rather than turn the Atlantic into a maintenance exercise.
Las Palmas
By November 2012 I was in Las Palmas in the Canary Islands. The final preparation became provisioning. Twelve kilograms of meat arrived vacuum packed and frozen from the butcher in the market, and I turned some of the stewing steak and mince into prepared meals. Diesel and water tanks were filled, the RIB was lifted onto the deck and everything below was secured.
On 19 November I and a new crew were ready. The plan was to leave just after first light for Barbados.

